Lightweight. The Future of Construction.
Reduces structure requirements, Reduces labor and equipment, Eliminates hoisting equipment, Designed to last a lifetime.
Technical Evaluation Report: TER 1909-03
Endorsements
“It was clear that your product offered a high-end appearance and a monetary savings over the other cornice systems considered by eliminating the need for backup metal framing.”
— Choate Construction Company
“The product not only was economically beneficial but we were extremely satisfied with how well the texture and color matched the existing building.”
— Facilities Planning and Construction, Medical College of Georgia
“By converting the cast-stone to Piazza Stone, we were able to save approximately $400,000 on the project. This significant cost-savings enabled Columbia County to expand other areas of the project and remain on budget.”